Table of Contents

Meeting

Remote Participation

Agenda

  1. Flight Dynamics Discussion led by Gary Flispart
    1. Simulations
    2. Specific takeaway points
      1. May want to make 8” minimum orifice to allow for valve obstruction
      2. Recommend 8” diameter minimum hole for safety
      3. Plan to drop ballast right after peak initial climb
  2. Draft of User Tracking Page (http://www.whitestarballoon.com/vis/test.html)
    1. Great flash charts and maps implemented by Brad
  1. Things to decide
    1. tubing
    2. Load line
      1. Poylethelyene - Dyneema fishing line
        1. Very low stretch high tensile strength
  2. Sensor string Contents received
    1. +Tubing PTFE
    2. +Load line
      1. +Glide Floss
    3. Electrical Components
      1. Logic all here
      2. Passives on way this weekend
    4. PCB arrival time
    5. Low press mpx sensor
    6. HeatShrink have
  1. To present
    1. CSBF report
    2. Pg 36-53 56-7 66 68 93 97
    3. NAT mnps manual highlighted
    4. Was wire ordered?
  1. To do
    1. preliminary telemetry for web guys
    2. Call mark
    3. Fix cryogenic chamber soft
    4. solicit donations for sumobot night
    5. Plan balloon inflate for sumo night
  1. Meetings to sched
    1. Safety planning
    2. Launch site selection
    3. Atc interaction
agendas/20101028.txt · Last modified: 2010/10/29 01:33 by steamfire
 
Except where otherwise noted, content on this wiki is licensed under the following license: CC Attribution-Share Alike 3.0 Unported
Recent changes RSS feed Donate Powered by PHP Valid XHTML 1.0 Valid CSS Driven by DokuWiki