Meeting November 4, 2010

  1. Assemble Balloon Payloads to fly tomorrow
    1. Highball-1/Sat modem
      1. Fit into box
      2. Fill + Secure (zip tie + electrical tape) battery holders
        1. Add pull tab
        2. Duct tape closed
        3. Secure with Net, ready to fly
    2. Bill Brown APRS
      1. Fill + Secure (zip tie + electrical tape) battery holder
        1. Add pull tab
      2. Duct tape closed
        1. Secure with Net, ready to fly
    3. Bill Brown Domino
      1. Fill + Secure (zip tie + electrical tape) battery holder
        1. Add pull tab
      2. Duct tape closed
    4. Make Net Holders for payloads
      1. Cable tie onto payload boxes
        1. Secure with Net, ready to fly
    5. Weigh all finished payloads
  2. Assemble SNOX Temperature Probes
    1. Call Caviezel to make sure these are OK
      1. Get his shipping address
    2. Glue connectors on to sharp end of each pipe(Be SURE to use good PVC cementing procedure - PLS READ INSTRUCTIONS)
    3. Put in a box for shipping
  3. Finish construction of Sat Modem Logger
agendas/20101104.txt · Last modified: 2010/11/05 00:12 by steamfire
 
Except where otherwise noted, content on this wiki is licensed under the following license: CC Attribution-Share Alike 3.0 Unported
Recent changes RSS feed Donate Powered by PHP Valid XHTML 1.0 Valid CSS Driven by DokuWiki