Meeting

  1. ATC Todo
    1. Document the Timeline
    2. Contact all members tonight
    3. Get logins for each to wiki
    4. Review position report
    5. Check with atc volunteers
    6. Possible ATC Volunteers
      1. Tim Hardin
      2. Pilot from model airplane club
  2. Meeting Notes
    1. Flight System Readiness
      1. Balloon Spreader
      2. Strobe mounting
      3. Ballast Bottle
    2. Test readiness
      1. RFI check
      2. Orbcomm full telemetry
    3. Servers
      1. Track.whitestarballoon.org
      2. Talk to them about backend database
      3. Hysplit offsite
        1. Still need to talk to Joe
        2. Set up server tonight by Saturday Noon
        3. check into AWS
      4. Mumble
        1. On amazon currently - make that the backup
        2. Make local copy the primary
      5. Telemetry parsing server
        1. Primary
          1. Possibly Pat's home machine
          2. Backup server location
        2. Procedure for switching over
          1. Tim will compile list of people who know how to switch from primary to backup
    4. Sim runs
      1. Friday night sim launch at 8PM
      2. Saturday afternoon sim launch at 3pm
    5. Launch Window 1
      1. Try running predtctions for closer to sunset
      2. Call Brian Tanner
      3. Get Launch Docs and Safety Docs to Brian
      4. Verify Launch Supplies
      5. Sign up launch team
        1. Tyler
        2. Dan
        3. Brad
        4. Ben
        5. Joe
  3. ATC Meeting Notes
    1. NOTAM
      1. Should it be HIBALL or BALRLS?
agendas/20110303.txt · Last modified: 2011/03/04 02:37 by steamfire
 
Except where otherwise noted, content on this wiki is licensed under the following license: CC Attribution-Share Alike 3.0 Unported
Recent changes RSS feed Donate Powered by PHP Valid XHTML 1.0 Valid CSS Driven by DokuWiki