White Star Balloon Meeting Notes

September 29, 2011

Short meeting tonight. More time for design work to be done.

Teamspeak 3 was demonstrated. Remote voice communication was tested successfully.

Battery pack voltage was verified. A new battery pack will not have to be built for Speedball-1.

Design work began for the new balloon valve system.

agendas/20110929.txt · Last modified: 2011/10/07 00:07 by nrarmen
 
Except where otherwise noted, content on this wiki is licensed under the following license: CC Attribution-Share Alike 3.0 Unported
Recent changes RSS feed Donate Powered by PHP Valid XHTML 1.0 Valid CSS Driven by DokuWiki