Agenda

  • Status Updates
    • Flight Computer Software
      • Minor errors, related to new ground support software
    • Com Controller Software
    • Iridium Simulator Connection
      • Software
      • Hardware connection
    • Ground Support
      • Update Controller Arduino to support new ground terminal software update
      • Add prefixes to all modules for message outputting
    • Sensor Controller Software
      • Camera Control Logic
    • Tracking Software
      • Raw data telemetry view page needs to be up ASAP
      • Website
        • Minor cosmetic updates on the list.
        • Ready to fly.
      • Database Adapter
        • 85% complete.
        • Need to correctly declare missing fields in XML.
        • Need to figure out low-overhead, high-redundancy db monitoring.
    • Mission Control
      • PCs setup?
      • Third Screen/Projector
      • Team Recruiting
      • Software Tools
  • Science Center Demo
    • Make a list of everything we need to bring
      • Balloon
      • Demo Payload
      • Ballast Bottle
      • Signs, stickers, etc.
    • Gather everything we need to bring
    • Run through fill procedure
  • Action Items
    • Raw data telemetry view page
    • Iridium Simulator Connection
    • Set Up Mission Control PCs (If not already set up)
      • 3 set up, Jon claims that 15 more are on the way.
    • Gather all Science Center things
      • Done
    • Figure out why com controller screws up I2C busDocument Com Controller I2C screw up
      • Bill was using A4 and A5 for other things, fixed.
agendas/20120223.txt · Last modified: 2012/02/24 02:08 by bradluyster
 
Except where otherwise noted, content on this wiki is licensed under the following license: CC Attribution-Share Alike 3.0 Unported
Recent changes RSS feed Donate Powered by PHP Valid XHTML 1.0 Valid CSS Driven by DokuWiki