Agenda

  • Speed School Demo - Saturday 8-4
  • Database
  • Tracking page flyable, still a few tweaks
  • Com Controller Software, not functional, Bill hasn't had time
  • Ground Support software needs cleaned up
    • too much information going by
    • ground support programming, end of night or soon
      • Pat will work on it
      • Need to get in touch with Jon, get latest version of code
    • ground support controller, not remotely programmable
      • com controller focus
        • Jose: ballast fill procedure, filter, might fly Speedball-2 ballast rig
    • Gary: Valve in alpha stage, valve ready, concerns about line fouling
      • will devise some test of side load effects.
      • need to devise zero pressure test on valve
agendas/20120301.txt · Last modified: 2012/03/02 01:47 by josephclagg
 
Except where otherwise noted, content on this wiki is licensed under the following license: CC Attribution-Share Alike 3.0 Unported
Recent changes RSS feed Donate Powered by PHP Valid XHTML 1.0 Valid CSS Driven by DokuWiki