Flight Dynamics Discussion led by Gary Flispart
Simulations
Specific takeaway points
May want to make 8” minimum orifice to allow for valve obstruction
Recommend 8” diameter minimum hole for safety
Plan to drop ballast right after peak initial climb
-
Great flash charts and maps implemented by Brad
Things to decide
tubing
Load line
Poylethelyene - Dyneema fishing line
Very low stretch high tensile strength
Sensor string Contents received
+Tubing PTFE
+Load line
+Glide Floss
Electrical Components
Logic all here
Passives on way this weekend
PCB arrival time
Low press mpx sensor
HeatShrink have
To present
CSBF report
Pg 36-53 56-7 66 68 93 97
NAT mnps manual highlighted
Was wire ordered?
To do
preliminary telemetry for web guys
Call mark
Fix cryogenic chamber soft
solicit donations for sumobot night
Plan balloon inflate for sumo night
Meetings to sched
Safety planning
Launch site selection
Atc interaction