October 06, 2011
Tasks to accomplish
Spring releases for Speedball-1 need to be strengthened by 3 lbs each.
Humidity sensor needs to be calibrated.
Cryogenic chamber center wall needs to be fixed to improve cooling.
Whitestarballoon.org needs to be revived.
Test burst flight scheduled for October 8th
Fly the weakest envelope under similar flight conditions.
Equipped with temperature sensor, two pressure sensors, data logger, and a radio.
Examine the flight through a telescope with an attached video camera.