[[
agendas:20120223
]]
White Star Balloon Wiki
Trace:
•
20120223
Agenda
Status Updates
Flight Computer Software
Minor errors, related to new ground support software
Com Controller Software
Iridium Simulator Connection
Software
Hardware connection
Ground Support
Update Controller Arduino to support new ground terminal software update
Add prefixes to all modules for message outputting
Sensor Controller Software
Camera Control Logic
Tracking Software
Raw data telemetry view page needs to be up
ASAP
Website
Minor cosmetic updates on the list.
Ready to fly.
Database Adapter
85% complete.
Need to correctly declare missing fields in
XML
.
Need to figure out low-overhead, high-redundancy db monitoring.
Mission Control
PCs setup?
Third Screen/Projector
Team Recruiting
Software Tools
Science Center Demo
Make a list of everything we need to bring
Balloon
Demo Payload
Ballast Bottle
Signs, stickers, etc.
Gather everything we need to bring
Run through fill procedure
Action Items
Raw data telemetry view page
Iridium Simulator Connection
Set Up Mission Control PCs (If not already set up)
3 set up, Jon claims that 15 more are on the way.
Gather all Science Center things
Done
Figure out why com controller screws up I2C bus
Document Com Controller I2C screw up
Bill was using A4 and A5 for other things, fixed.
agendas/20120223.txt · Last modified: 2018/07/29 17:58 (external edit)
Except where otherwise noted, content on this wiki is licensed under the following license:
CC Attribution-Share Alike 3.0 Unported